Accountability Studio · Instrument 04
Accountability Eval Kit
How accountable is this workflow?
Assess six capabilities across the accountability chain. The result is a structured design conversation—not a certification or legal conclusion.
Synthetic operational environmentDesign proposition 04
A mature model inside an immature operating system is still an accountability risk.
Evaluation must include the organisation around the model: who decides, what they know, how they intervene and whether the outcome can be contested.